Block production on the FLOP devnet has returned to its normal level. BitBasic rates the devnet's health as Healthy again, after it was rated Degraded during a slowdown that ran from about 15 to 20 November 2026. FLOP has not commented on the slowdown or the recovery on its official channels.
BitBasic reported the slowdown on 17 November and 19 November.
What BitBasic measured
The devnet aims to make one block a second, or 86,400 a day. Here is the share of slots that got a block on each full UTC day:
- 18 November: 83.27% (14,459 empty slots)
- 19 November: 86.18% (11,937 empty slots)
- 20 November: 92.23% (6,715 empty slots)
- 21 November: 94.94% (4,370 empty slots)
- 22 November, up to about 05:00 UTC: 99.72% (51 empty slots)
The 19 November figure covers the whole day. BitBasic's earlier post gave 77.41%, but that counted only the first five hours.
At 05:04 UTC on 22 November the devnet scored 100%: 1,800 blocks in the last 1,800 one-second slots. The latest finalised block was 5 blocks behind the newest, so blocks were being finalised normally. Before the slowdown, production was mostly above 99% a day. For example, it was 99.41% on 12 November.
Runtime updates
BitBasic last recorded the runtime changing at 08:54 UTC on 20 November 2026, from version 1,014,029 to 1,014,031. Production improved each day after that. On 18 November the runtime went from 1,014,020 to 1,014,027, so there was at least one more update between the two. FLOP has not said what these updates changed, so BitBasic cannot say whether they fixed the slowdown.
The devnet has 13 active validators and one in the queue. The active set rotates every 30 days, and the next rotation is due in about 18 days, at block 5,899,412.
What it means
This is a development network. It earns nothing, and FLOP says that devnet tokens are non-tradable test tokens with no value. The devnet can also be reset at any time. Nobody outside the devnet has to do anything.
- Devnet operators: make sure your node runs the current runtime and produces blocks when its turn comes. A new release never upgrades a node automatically, according to FLOP's operator docs. The validator guide is the reference.
- Testnet: FLOP's timeline FAQ was last updated on 20 November. It still gives 24 November 2026 as the target for the public testnet, "subject to readiness", and says this is not a confirmed launch.